EZ Purge

®

PRE-FORMED, SELF-ADHESIVE WATER SOLUBLE PURGE DAMS

US & FOREIGN PATENTS ISSUED |

MADE IN THE USA

Made from 100% biodegradable Aquasol® Water Soluble Paper with EPA-approved ZAP® (Zero Air Permeability) technology, it dissolves completely without leaving residue for a cleaner, more efficient purge solution.

PRODUCT OVERVIEW

Patented and practical, EZ Purge® is a pre-formed, self-adhesive purge dam that enables operators to save time on weld preparation and improve overall project timeliness. EZ Purge has tapered side walls to fit a variety of pipe schedules and its flat design enables equal distribution of gases across the body of the dam.

Uniquely engineered, EZ Purge comes equipped with EPA approved ZAP® (Zero Air Permeability) technology that maximizes gas retention and reduces gas expenditures. This water soluble purge dam is

comprised of Aquasol® Water Soluble Paper and is 100% biodegradable and environmentally friendly. EZ Purge rapidly dissolves, leaving behind no residue in the pipeline.

EZ Purge saves valuable labor hours on dam construction and is easy to use. The operator simply peels, inserts, and presses the purge dam into place. No other product available on the market today can provide such a reliable, efficient, and environmentally sound solution to your pipe purging needs.

PRODUCT OVERVIEW

Patented and practical, EZ Purge® is a pre-formed, self-adhesive purge dam that enables operators to save time on weld preparation and improve overall project timeliness. EZ Purge has tapered side walls to fit a variety of pipe schedules and its flat design enables equal distribution of gases across the body of the dam.

Uniquely engineered, EZ Purge comes equipped with EPA approved ZAP® (Zero Air Permeability) technology that maximizes gas retention and reduces gas expenditures. This water soluble purge dam is comprised of Aquasol® Water Soluble Paper and is 100% biodegradable and environmentally friendly. EZ Purge rapidly dissolves, leaving behind no residue in the pipeline.

EZ Purge saves valuable labor hours on dam construction and is easy to use. The operator simply peels, inserts, and presses the purge dam into place. No other product available on the market today can provide such a reliable, efficient, and environmentally sound solution to your pipe purging needs.

APPLICATIONS

Energy & Heavy Industry

High-Purity & Critical Applications

Industrial & Fabrication

FEATURES AND BENEFITS

Uniquely Engineered and Patented Design

  • ZAP (Zero Air Permeability) technology maximizes gas retention
  • Flat design enables equal distribution of gases across body of dam
  • Side walls tapered to fit different pipe schedules
  • Generous portion of water soluble tape pre-installed in sections for precise alignment

Cost Effective

  • Save precious labor hours on dam construction:

    – Gathering Supplies
    – Measuring
    – Cutting
    – Constructing
    – Fitting

  • Improve project timeliness
  • Save on gas consumption
  • Reduce inventory expenditures

Ease of Removal

  • Made of Aquasol Water Soluble Paper (sodium carboxymethyl cellulose and wood pulp)
  • Combined with other water soluble polymeric composites for added strength
  • 100% biodegradable and environmentally friendly
  • Dissolves rapidly leaving no residue in the pipeline

HOW EZ PURGE WORKS

Recommended Proximity to Weld Joint

* or distance recommended by Project Engineer

PIPE SIZE RECOMMENDED DISTANCE*
English Metric English Metric
2" – 8" 51 – 203 mm 6" 152 mm
10" – 22" 254 – 559 mm 8" 203 mm
24" – 36" 610 – 914 mm 12" 305 mm
40"+ 1 m+ 24" 610 mm

Purge Dam Set Up

To ensure maximum adhesion of EZ Purge, be sure to clean the interior of the pipe with EZ Wipes, multi-purpose, saturated cleaning cloth.

1. PEEL

2. INSERT

3. PRESS

4. ACTIVATE AFTER POSITIONING

Peel liner off outer circumference of dam to fully expose adhesive, keeping it away from contaminants and debris.

Align adhesive edges to the inside pipe wall and insert dam to desired location.

Thoroughly press adhesive on circumference of dam along inside of pipe wall to create even seal.

Moisten an ordinary sponge with water, squeeze out excess water until sponge is damp. Lightly dab sponge along Aquasol Water Soluble Tape portion of dam. The dampened sponge will reactivate the adhesive to ensure zero air permeability.

Purge Dam Set Up

To ensure maximum adhesion of EZ Purge, be sure to clean the interior of the pipe with EZ Wipes, multi-purpose, saturated cleaning cloth.

1. PEEL

Peel liner off outer circumference of dam to fully expose adhesive, keeping it away from contaminants and debris.

2. INSERT

Align adhesive edges to the inside pipe wall and insert dam to desired location.

3. PRESS

Thoroughly press adhesive on circumference of dam along inside of pipe wall to create even seal.

4. ACTIVATE AFTER POSITIONING

Moisten an ordinary sponge with water, squeeze out excess water until sponge is damp. Lightly dab sponge along Aquasol Water Soluble Tape portion of dam. The dampened sponge will reactivate the adhesive to ensure zero air permeability.

TROUBLE SHOOTING

1

2

1

2

3

TROUBLE SHOOTING

REPOSITIONING

The dam surface should be perfectly perpendicular to the pipe wall. If the dam is not straight when placed in the pipe, it can be easily repositioned. To adjust without damaging the dam, carefully remove the tape portion of dam from the sidewall of the pipe. Move the dam to the desired location and apply additional Aquasol Water Soluble Tape for reinforcement, if required.

1

2

3

ADJUSTING TO CREATE PROPER FIT

The edges of EZ Purge must lay flat against the inner pipe wall. If any air pockets or puckered wrinkles are visible, the seal must be adjusted to yield the optimal results.

To maximize the dam’s seal, cut a slit in the adhesive portion of the dam that is allowing air to enter the purge chamber.

Then, simply overlap the cut ends to create the desired seal. Repeat as necessary to improve seal.

As with a torn dam, simply cover the ‘wrinkled’ area with slightly moistened Aquasol Water Soluble Tape.

TYPES & SIZES

ITEM NOPIPE DIAMETERCASE PACK
 EnglishMetric 
EZP-22″51 mm192
EZP-33″76 mm192
EZP-44″102 mm48
EZP-55″127 mm48
EZP-66″152 mm48
EZP-88″203 mm48
EZP-1010″254 mm48
EZP-1212″305 mm48
EZP-1414″356 mm24
EZP-1616″406 mm24
EZP-1818″457 mm24
EZP-2020″508 mm24
EZP-2222″559 mm24
EZP-2424″610 mm24
EZP-2626″660 mm24
EZP-2828″711 mm24
EZP-3030″762 mm24
EZP-3232″813 mm24
EZP-3636″914 mm24
EZP-4040″1016 mm10
EZP-4242″1067 mm10
EZP-4444″1118 mm10
EZP-4848″1219 mm10
EZP-5252″1321 mm10
EZP-5656″1422 mm10
EZP-6060″1524 mm10
EZP-6464″1626 mm10
EZP-7272″1829 mm10
EZP-8484″2134 mm10

ITEM NOPIPE DIAMETERCASE PACK
 EnglishMetric 
EZP-.501/2″13 mm1000
EZP-.753/4″19 mm1000
EZP-1.01″25 mm1000
EZP-1.251 1/4″32 mm1000
EZP-1.501 1/2″38 mm1000
EZP-2.52 1/2″63 mm1000
EZP-3.03″76 mm1000

Sizes below 2″ (50.8 mm) and above 40″ (1016 mm) are custom manufactured to order. Inquire for availability and allow 1-3 weeks for manufacture.

FACTS & FAQs

Aquasol Water Soluble Products, including EZ Purge Water Soluble Purge Dams, must be flushed with an aqueous solution or steam in order to dissolve. Contact Aquasol Corporation for further information.

When welding, the EZ Purge dams must be placed far enough from the root gap so that the Heat Affected Zone (HAZ) does not char or degrade the paper’s water soluble properties.
Recommend distances for placing EZ Purge from the root gap are listed below. These distances depend on the pipe diameter size (ID) or the recommended distance provided by the project engineer to move out of the HAZ.

Pipe SizeRecommended Distance
(English)
Recommended Distance
(Metric)
2 – 8″6″152 mm
10 – 22″8″203 mm
24 – 36″12″305 mm
40″+24″610 mm

EZ Purge is made from Aquasol Water Soluble Paper, which has a flash point of 450°F (232°C).

To create a tight seal, first ensure the surface of the inner pipe has been cleaned and that no oils remain. This will increase the integrity of the seal. Once the dam is correctly positioned, the dam can be secured in place by introducing moisture to reactivate the adhesive and form a tight seal. Please note, it is recommended to use a lightly moistened sponge, and not a dripping sponge. Too much moisture will cause the paper and tape adhesive to start to dissolve.
For more information, please refer to our video at http://www.youtube.com/watch?v=77smUxzdDg8 minute marker 9:17.

If the water soluble tape becomes dry, lightly moisten it with a dampened cloth or foam brush. The adhesive will be reactivated instantaneously. Be careful not to saturate the cloth as the tape will dissolve.

The EZ Purge adhesive is engineered in such a way that it will not inhibit the user from placing the dam in proper position. The strength of the “tack” or stickiness of the adhesive allows the user to have control and reposition the dam if not properly placed on the first attempt.
To reposition EZ Purge, carefully remove the tape portion of dam from the sidewall of the pipe. Then move it to the desired location and apply additional Aquasol Water Soluble Tape for reinforcement, if required.

If the size of EZ Purge does not exactly match the size of the pipe, it is easy to alter the dam to create the perfect desired fit. Simply cut the tape portion of dam as it is being inserted. Then overlap the cut ends to create the desired size. Repeat if necessary. If the pipe ID is slightly too big for the specific EZ Purge size, additional Aquasol Water Soluble Tape can be added to reinforce the seal along the pipe wall.

It takes approximately 5 minutes for the EZ Purge adhesive liner to dry after being dampened for application.

If the water soluble EZ Purge dam tears accidentally during installation, simply cover torn spot with Aquasol Water Soluble Tape.

EZ Purge has a shelf life of approximately one year. To increase shelf life, store EZ Purge in a dark, cool and humidity controlled environment. Ideal storage temperature is 70°F with approximately 50% humidity. EZ Purge should always be stored in the water proof package that is included with purchase. Contact with water must be avoided at all times. For easy reference, the manufacturing date is labeled on the bottom of each EZ Purge box.

EZ Purge is used in various industries including off-shore oil rigs, refineries, fossil fuel plants, breweries, shipbuilding, processing plants (food, dairy, beverage, pharmaceutical), nuclear power plants, government and military, power plants, petrochemical plants, water treatment plants and much more.

Watch Video

Play Pause
Backward 10s Play Pause Forward 10s Unmute Mute
/
Settings Playback Accessibility
Announcements
Keyboard Animations
Quality
Enter PiP Exit PiP Enter Fullscreen Exit Fullscreen
Water Soluble Purge Dams — EZ Purge from Aquasol Welding